A complete rehabilitation-aquatics renovation spanning the main therapy pool and a separate treatment basin, with documented tear-out, substrate preparation, geotextile protection and field-detailed membrane installation.
FacilityIndoor rehabilitation hospital aquatic facility
Project size2,500 sq. ft.
Onsite schedule10 working days
Installed systemDistributor-specified reinforced PVC membrane
Completed dry
Siskin Rehabilitation Hospital Completed dry
Both rehabilitation pool areas after membrane detailing
Returned to service
Siskin Rehabilitation Hospital Returned to service
Main rehabilitation pool filled and operational

The existing condition

What the crew walked into.

The enclosed hospital facility combined multiple connected aquatic areas with a central structural column, accessibility stairs, therapy rails, recessed ladders, jets, drains, skimmers and a dense field of penetrations. The existing system had to be fully removed while the surrounding deck and occupied healthcare environment remained protected.

Field execution

How the system was rebuilt.

Ferguson Aquatics removed the existing membrane to expose the pool shells, completed preparation across both basins, then fitted the specified geotextile protection layer around the floors, walls, stairs, column and penetrations. The distributor-provided membrane was field installed with indoor-appropriate adhesive, black lane and safety markings, depth markers and individually finished fittings before the pools were filled and returned to service.

Documented execution

From tear-out to a finished aquatic system.

Each phase is shown in sequence so facility teams can see the preparation and detailing behind the completed surface.

Siskin Rehabilitation Hospital main pool during complete membrane tear-out
01

Controlled tear-out

The existing membrane was removed across the main pool and therapy basin, exposing the underlying shell and every stair, fitting and penetration for inspection.

Prepared Siskin Rehabilitation Hospital pool shell after membrane removal
02

Shell preparation

The exposed floors, walls, steps and central-column transitions were cleaned and prepared before the new protection and waterproofing assembly was introduced.

Geotextile protection layer installed throughout the Siskin main pool
03

Geotextile protection

The specified geotextile layer was field fitted across both basins and carefully cut around stairs, slopes, drains, jets and other recessed details.

Completed dry membrane installation and lane markings at Siskin Rehabilitation Hospital
04

Membrane and safety detailing

The distributor-specified membrane was installed with field-welded lanes, targets, stair markings, depth markers and completed fitting terminations.

Scope of work

Detailed for long-term performance.

Each item was coordinated as part of the same waterproofing assembly—not treated as a separate finish detail.

  1. 01Controlled protection of the surrounding indoor pool deck
  2. 02Existing membrane tear-out and disposal across both pool bodies
  3. 03Substrate exposure, inspection and surface preparation
  4. 04Specified geotextile protection layer on floors, walls, slopes and stairs
  5. 05Distributor-specified reinforced PVC membrane installation
  6. 06Indoor-appropriate adhesive application
  7. 07Field-welded lap lanes, targets and stair safety markings
  8. 08Custom detailing at the structural column, rails, jets, drains, skimmers and wall fittings
  9. 09Depth-marker installation and accessibility-detail coordination
  10. 10Final seam, penetration and termination inspection