Commercial resources

Better pool decisions start before mobilization.

Practical guidance for facility owners, aquatic directors, contractors and design teams evaluating reinforced PVC membrane renovation.

01

RENOLIT system selection

Compare product families, thickness classes, finishes and typical applications.

Open the selection guide
02

Technical data center

Understand the documents and details that belong in a commercial submittal package.

Review technical documents
03

Renovation process

See how assessment, preparation, field installation and closeout fit together.

Review our services

Bid-ready information

What helps us evaluate a commercial pool accurately.

Good documentation reduces allowances, avoids hidden assumptions and helps the owner compare scopes on equal terms.

Common planning questions

Direct answers for project teams.

01

Can membrane go over the existing finish?

Often, but only after the substrate and existing finish are evaluated. Loose material, active movement, incompatible surfaces and failed details must be addressed in the scope.

02

Is every pool specified with the same thickness?

No. Thickness, texture, slip resistance, exposure, facility use and project specification are reviewed together.

03

What controls the shutdown schedule?

Pool size is only one factor. Tear-out, moisture, substrate correction, access, cure times, fittings, gutters and specialty markings can materially affect duration.

04

What should a bid package identify?

The selected membrane system, preparation assumptions, protection layer, accessories, penetrations, exclusions, schedule, payment terms and applicable warranty documents.

Planning a renovation or preparing a bid?

Send project information