Euclid, Ohio · Municipal park pool
Euclid Park Pool
A deteriorating public competition pool received a complete reinforced membrane system with custom zero-entry and lane-detail integration.FacilityMunicipal park pool
Project size7,000 sq. ft.
Onsite schedule10 working days
Installed system70-mil RENOLIT reinforced PVC membrane
Before

After

The existing condition
What the crew walked into.
The large outdoor municipal shell required a uniform waterproof surface while preserving competition markings, zero-entry geometry and the many details expected in a public facility.
Field execution
How the system was rebuilt.
Ferguson Aquatics prepared the existing shell, installed the reinforced membrane and integrated lane lines, targets, depth markers and the zero-entry transition into one coordinated system.
Scope of work
Detailed for long-term performance.
Each item was coordinated as part of the same waterproofing assembly—not treated as a separate finish detail.
- 01Surface preparation and substrate correction
- 0270-mil RENOLIT reinforced PVC installation
- 03Custom zero-entry detailing
- 04Integrated lanes, targets and depth markers
Photo documentation
See the pool at full frame.
Images are shown without aggressive cropping so the shell geometry, transitions and completed work stay visible.







Specified material