All projects

Euclid, Ohio · Municipal park pool

Euclid Park Pool

A deteriorating public competition pool received a complete reinforced membrane system with custom zero-entry and lane-detail integration.
FacilityMunicipal park pool
Project size7,000 sq. ft.
Onsite schedule10 working days
Installed system70-mil RENOLIT reinforced PVC membrane
Before
Euclid Park Pool before renovation
Existing condition
After
Euclid Park Pool after PVC membrane installation
Completed system

The existing condition

What the crew walked into.

The large outdoor municipal shell required a uniform waterproof surface while preserving competition markings, zero-entry geometry and the many details expected in a public facility.

Field execution

How the system was rebuilt.

Ferguson Aquatics prepared the existing shell, installed the reinforced membrane and integrated lane lines, targets, depth markers and the zero-entry transition into one coordinated system.

Scope of work

Detailed for long-term performance.

Each item was coordinated as part of the same waterproofing assembly—not treated as a separate finish detail.

  1. 01Surface preparation and substrate correction
  2. 0270-mil RENOLIT reinforced PVC installation
  3. 03Custom zero-entry detailing
  4. 04Integrated lanes, targets and depth markers

Have a pool with a similar problem?

Discuss your project