A torn, brittle membrane was allowing water to migrate behind the liner and into the pool shell. Ferguson Aquatics removed the failed system, rebuilt the coping-wrap termination and installed a reinforced two-color membrane system.
FacilityResort lodge pool
Project size3,150 sq. ft.
Onsite schedule12 working days
Installed system70-mil Adriatic Blue + 80-mil Light Grey coping wrap
Before
Hueston Woods Lodge before renovation
Existing condition
After
Hueston Woods Lodge after PVC membrane installation
Completed system

The existing condition

What the crew walked into.

The existing membrane had become torn and brittle, allowing water to move behind the liner and into the shell. The original coping detail was trapped beneath the surrounding deck, so a proper replacement could not be installed without opening that termination.

Field execution

How the system was rebuilt.

The crew completed the tear-out, cut back the existing deck to expose and rebuild the coping-wrap termination, prepared the shell and installed 70-mil Adriatic Blue membrane with an 80-mil Light Grey coping wrap—all in 12 working days.

Scope of work

Detailed for long-term performance.

Each item was coordinated as part of the same waterproofing assembly—not treated as a separate finish detail.

  1. 01Complete existing membrane tear-out
  2. 02Deck saw-cutting to expose the coping termination
  3. 03Substrate preparation and moisture-affected area correction
  4. 0470-mil Adriatic Blue reinforced PVC membrane
  5. 0580-mil Light Grey coping wrap
  6. 06Custom detailing at steps, penetrations and transitions