Chagrin Falls, Ohio · Commercial pool

In progress · Updated October 8, 2026

Lake in the Woods Pool Renovation

Follow our 3,500-square-foot pool renovation at Lake in the Woods in Chagrin Falls, Ohio. The previous PVC membrane has been removed and disposed of, exposing the shell for repairs and preparation.
FacilityCommercial pool
Project size3,500 sq. ft.
StatusIn progress
Project scopePVC membrane renovation · installation upcoming
Before tear-out
Lake in the Woods Pool Renovation Before tear-out
Pool filled before membrane removal
Current progress
Lake in the Woods Pool Renovation Current progress
Exposed shell after removal of the previous PVC membrane

The existing condition

What the crew walked into.

Removing the previous PVC membrane revealed existing shell issues that need to be repaired before the new interior is installed. The photos below document the filled pool, the drained pool with its old membrane still in place, and the exposed shell after tear-out.

Field execution

Where the project stands.

Our crew completed removal and disposal of the previous membrane and began removing loose concrete and tiles. Next comes shell repair and surface preparation before the new membrane installation. This page will follow the project as work continues.

Documented execution

From filled pool to exposed shell.

Completed stages shown in order. Repairs and installation will follow.

Lake in the Woods pool filled with water before PVC membrane removal
01

Before draining

The existing pool before membrane tear-out began.

Drained Lake in the Woods pool with the previous membrane still in place
02

Drained pool

Water removed, with the previous PVC membrane still in place.

Exposed Lake in the Woods pool shell after complete membrane removal
03

Shell exposed

Previous membrane removed and disposed of. Loose concrete and tile removal has begun.

Scope of work

Detailed for long-term performance.

Completed work and upcoming stages for this active renovation.

  1. 01Completed: removal of the previous PVC membrane
  2. 02Completed: disposal of the removed membrane
  3. 03Underway: removal of loose concrete and tiles
  4. 04Upcoming: shell repairs and surface preparation
  5. 05Upcoming: new PVC membrane installation