All projects

Pittsburgh, Pennsylvania · Multifamily community

Pittsburgh Multifamily Pool Replacement

A failed 15-plus-year-old liner was removed to expose the concrete shell, then replaced with a reinforced white membrane system and contrasting coping wrap.
FacilityMultifamily community
Project size1,200 sq. ft.
Onsite schedule5 working days
Installed system70-mil RENOLIT membrane + 80-mil coping wrap
Before
Pittsburgh Multifamily Pool Replacement before renovation
Existing condition
After
Pittsburgh Multifamily Pool Replacement after PVC membrane installation
Completed system

The existing condition

What the crew walked into.

The existing liner had exceeded 15 years of service. Complete removal exposed a worn concrete shell and aging stair geometry that had to be prepared before the new waterproofing assembly could be installed.

Field execution

How the system was rebuilt.

Ferguson Aquatics removed the aged liner, documented and prepared the exposed shell, installed the protection layer and 70-mil pool membrane, then completed the perimeter with a contrasting 80-mil coping wrap.

Scope of work

Detailed for long-term performance.

Each item was coordinated as part of the same waterproofing assembly—not treated as a separate finish detail.

  1. 01Existing liner tear-out
  2. 02Exposed concrete-shell preparation
  3. 03150-mil fleece protection layer
  4. 0470-mil RENOLIT reinforced PVC installation
  5. 0580-mil coping wrap
  6. 06Custom stair, fitting and safety-detail integration

Have a pool with a similar problem?

Discuss your project